The Five Phases of Residential Land Development
1. Site Evaluation & Acquisition Support
Before purchase or after acquisition, SDB+D evaluates parcels for the factors that determine whether a site is genuinely buildable at the cost and timeline a client expects. Evaluation covers topography and grading, utility access (or required extensions), OSSF feasibility for sites without municipal sewer, water table and groundwater conditions, drainage and 100-year flood risk, entitlement constraints from zoning, watershed protection, and impervious cover limits, easements and access rights, and tree preservation requirements. We work alongside luxury land brokers and can advise before purchase, during due diligence, or after closing. For Hill Country properties especially, these factors are often the difference between a viable build and an expensive surprise.
2. Infrastructure Development — Water, Power, Sewer, OSSF
Most Texas Hill Country sites lack municipal utilities. Bringing a site to buildable condition requires substantial infrastructure work before a single foundation stake is driven. SDB+D handles On-Site Sewage Facility (OSSF) design and installation coordination including conventional, aerobic, drip-distribution, and low-pressure-dose systems sized to site conditions and home program. Well water and groundwater planning. Electrical service extension and transformer placement coordination with the local utility. Propane and natural gas service coordination. Stormwater management infrastructure. We coordinate the licensed engineers, well drillers, OSSF installers, and utility contractors required. Infrastructure timelines are often the longest pole in a Hill Country build, and integrated planning prevents the most expensive schedule surprises.
3. Municipal Entitlement & Variance Hearings
Entitlement is the regulatory process that allows construction to legally begin: zoning verification, site plan approval, watershed compliance, environmental review, tree preservation review, and the various permits required by the local jurisdiction. When a site requires deviation from standard code — setback reductions, height variances, impervious cover adjustments, use changes, historic district approvals — a variance hearing is required. SDB+D's principal has direct expertise in permit coordination, expediting, variance hearing preparation, and Board of Adjustment presentation. We work in City of Austin jurisdiction, Travis County, Hays County, Burnet County, and surrounding ETJ. Entitlement work for difficult Hill Country sites, infill lots with non-standard conditions, and historic-district remodels is where this experience matters most.
4. SBA & Construction Finance Coordination
SDB+D's principal serves as an SBA construction finance coordinator for development projects where SBA 504 or 7(a) financing applies — typically commercial development, mixed-use projects, live-work properties, and business-related construction rather than purely residential. For owner-occupied custom homes, traditional construction-to-permanent loans are more common, and we coordinate with the client's lender during the development phase to ensure draw schedules, appraisal milestones, and infrastructure progress align with financing terms. We can also advise on financing structure for complex multi-phase developments.
5. Environmental & Feasibility Studies
Larger sites and sites in environmentally sensitive areas (Edwards Aquifer Recharge Zone, contributing zone, BCCP habitat, and similar) require environmental review and feasibility studies before development can proceed. SDB+D coordinates the licensed environmental consultants, hydrogeologists, biologists, and archaeologists required for these studies, and translates findings into actionable development plans. We have experience navigating Edwards Aquifer Authority requirements, City of Austin Save Our Springs Initiative compliance, and Hill Country watershed protection rules.